Merlin CRITICAL PATH 1998 VS Giant ANTHEM X ADVANCED SL 1 2011 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Giant Anthem X Advanced SL 1
General InfosModel | Anthem X Advanced SL 1 |
Manufacturer | Giant |
Year of production | 2011 |
Current price | Check price Here ==> |
Color choice |
-Composite and red |
Sizes |
- Small - Medium - Large - Extra large |
Wheels And Breaking System
Bike front tire | 26 X 2.1 (inches) Maxxis Crossmark |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Elixir R Levers Avid Elixir R Brakes |
Hubs for disc brakes | Rear: DT Swiss 370 SL Front: Giant Tracker |
Rims manufacturer | 32-hole DT Swiss X430 |
Spoke nipples type | Alloy |
Spoke wheel | 14/15ga. Sapim |
Frame and Body Specs
Frame materials | Advanced SL-Grade Composite |
Frame type | Not Available |
Handlebar construction | Giant Connect SL 31.8 |
Handlebar extender | Optional |
Handlebar stem details | Giant Connect SL |
Headset size | Not Available |
Gearing Specifications
Bicycle chain | SRAM PC1050 |
Bottom bracket shell width | Not Available |
Bottom bracket type | SRAM GXP |
Crankset parts and sizes | 28/42t Teeth SRAM X.9 |
Gear shift levers | SRAM X.9 |
Rear gear set | 12 - 36 Teeth 10-speed |
Giant Anthem X Advanced SL 1 Fork System Data
Derailleur (Front) | SRAM X.9 |
Derailleur (Rear) | SRAM X.9 |
Fork material | Not Available |
Fork type | 100 (millimeters) Travel Rock Shox SID RLT |
Other Specs of Giant Anthem X Advanced SL 1
Component group sets | SRAM Mix |
Pedals details | Optional |
Rear shock absorber | 4 (inches) Maestro RockShox Monarch RT3 |
Saddle seat | Fi'zi:k Tundra 2 |
Seat post extension | 30.9 (millimeters) Diameter Giant Connect SL |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Giant Anthem X Advanced SL 1 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Giant Anthem X Advanced SL 1 Mountain bike here