Merlin CRITICAL PATH 1998 VS Giant ANTHEM X0 2009 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Giant Anthem X0 2009 comparison online with competitors

Giant Anthem X0

General Infos
Model Anthem X0
Manufacturer Giant
Year of production 2009
Current price Check price Here ==>   
Color choice -White and Brushed
Sizes - Xsmall
- small
- medium
- large
- xlarge

Wheels And Breaking System

Bike front tire26 X 2.00 (inches) Michelin XC Dry 2
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Juicy Ultimate Carbon Levers
Avid Juicy Ultimate With 160 (millimeters) Rotor Front and Avid Juicy Ultimate With 140 (millimeters) Rotor Rear Brakes
Hubs for disc brakesMavic Crossmax SL
Rims manufacturerMavic Crossmax SL
Spoke nipples typeNot Available
Spoke wheelNot Available

Frame and Body Specs

Frame materialsALUXX SL Aluminum
Frame typeTIG-welded
Handlebar constructionRace Face Next Low Riser
Handlebar extenderOptional
Handlebar stem detailsRace Face Deus XC 31.8
Headset size1 1/8" c

Gearing Specifications

Bicycle chainShimano HG73
Bottom bracket shell widthNot Available
Bottom bracket typeRace Face X-Type
Crankset parts and sizes 22/32/44 Teeth
Race Face Deus
Gear shift leversSRAM X.0 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Giant Anthem X0 Fork System Data

Derailleur (Front)Shimano XT
Derailleur (Rear)SRAM X.0 Carbon
Fork materialSingle
Fork type 100 (millimeters) Travel
RockShox SID World Cup

Other Specs of Giant Anthem X0

Component group setsSRAM X.0/mix
Pedals detailsNot Available
Rear shock absorber 4 (inches) Travel
Fox Float RP23
Saddle seatWTB Silverado Race SL
Seat post extension 30.9 (millimeters) Diameter
Race Face Next SL


Useful links and guides ....