Merlin CRITICAL PATH 1998 VS Giant FAITH 1 2006 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Giant Faith 1 2006 comparison online with competitors

Giant Faith 1

General Infos
Model Faith 1
Manufacturer Giant
Year of production 2006
Current price Check price Here ==>   
Color choice -Polished
Sizes - 16.5 (inches)
- 18 (inches)
- 20 (inches)

Wheels And Breaking System

Bike front tire Rear: 26 X 2.25 (inches) Kenda Nevagal
Front: 26 X 2.25 (inches) Kenda Blue Groove
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Levers
Hayes HFX-9 Hydraulic Disc Brakes
Hubs for disc brakesFormula Disc
Rims manufacturerMavic EX 729D
Spoke nipples typeNot Available
Spoke wheelStainless Steel

Frame and Body Specs

Frame materialsALUXX Aluminum
Frame typeTIG-welded
Handlebar constructionRace Face Evolve FR
Handlebar extenderNot Available
Handlebar stem detailsRace Face Evolve FR
Headset size1 1/8 (inches) Integrated

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG73
Bottom bracket shell widthNot Available
Bottom bracket typeRace Face Evolve X-Type
Crankset parts and sizesRace Face Evolve DH X-Type
Gear shift leversSRAM X.7
Rear gear set 11 - 34 Teeth
9-speed

Giant Faith 1 Fork System Data

Derailleur (Front) Clamp-on
Shimano Deore LX
Derailleur (Rear)SRAM X.9
Fork material Single Crown
Aluminum and magnesium
Fork type 170 (millimeters) Travel
Marzocchi 66RC2X

Other Specs of Giant Faith 1

Component group setsMountain Mix
Pedals detailsTruvativ Hussefelt
Rear shock absorber 8 (inches) Travel
Fox DHX 4.0 Coil
Saddle seatWTB Laser V Team
Seat post extension 30.9 (millimeters) Diameter
Race Face Atlas AM


Useful links and guides ....