Merlin CRITICAL PATH 1998 VS Giant MCM 980 1998 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Giant MCM 980 1998 comparison online with competitors

Giant MCM 980

General Infos
Model MCM 980
Manufacturer Giant
Year of production 1998
Current price Check price Here ==>   
Color choice -Natural carbon and polished
Sizes - Medium

Wheels And Breaking System

Bike front tire26 X 1.95 (inches) WTB VelociRaptor 44/50
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Grip Shift ESP 9.0 Levers
Shimano Deore XT V-Brake Brakes
Hubs for disc brakes Rear: Shimano Deore XT
Front: Formula
Rims manufacturer 32-hole
Mavic X517
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Double-butted
DT Stainless Steel

Frame and Body Specs

Frame materialsCarbon Fiber Composite and aluminum
Frame typeTIG-welded and bonded
Handlebar construction Butted
Aluminum
Handlebar extenderAluminum
Handlebar stem detailsAluminum
Headset size1 1/8 (inches) Threadless Aheadset SAS

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Sachs PC-41
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 110 (millimeters) Spindle
Shimano BB-UN72
Crankset parts and sizes 24/34/42 Teeth
Shimano Deore XT
Gear shift leversGrip Shift ESP 9.0
Rear gear set 11 - 28 Teeth
8-speed

Giant MCM 980 Fork System Data

Derailleur (Front) Top-pull and braze-on
Shimano Deore XT Top-swing
Derailleur (Rear)Grip Shift ESP 9.0
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Judy SL

Other Specs of Giant MCM 980

Component group setsGrip Shift ESP 9.0/Shimano Deore XT
Pedals detailsWellgo WPD-702 Clipless
Rear shock absorber 4.0 (inches) Travel
Rock Shox Coupe Deluxe
Saddle seat Hollow Chromoly Rails With Kevlar Sides
WTB SSTK
Seat post extension 30.8 (millimeters) Diameter
Aluminum Micro-adjust


Useful links and guides ....