Merlin CRITICAL PATH 1998 VS Giant REIGN 1 2006 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Giant Reign 1 2006 comparison online with competitors

Giant Reign 1

General Infos
Model Reign 1
Manufacturer Giant
Year of production 2006
Current price Check price Here ==>   
Color choice -Coffee
Sizes - 15 (inches)
- 16 (inches)
- 18 (inches)
- 20 (inches)
- 21 (inches)

Wheels And Breaking System

Bike front tire26 X 2.30 (inches) Hutchinson Bulldog AirLight
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Composite Front and Hayes Carbon Rear Levers
Hayes HFX-9 Carbon Disc Brakes
Hubs for disc brakesWTB LaserDisc
Rims manufacturerWTB LaserDisc Trail
Spoke nipples typeNot Available
Spoke wheelDT Swiss Competition Stainless Steel

Frame and Body Specs

Frame materialsALUXX Aluminum
Frame typeTIG-welded
Handlebar constructionRace Face Evolve XC Low-rise
Handlebar extenderNot Available
Handlebar stem detailsRace Face Evolve XC
Headset size1 1/8 (inches) Integrated

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG73
Bottom bracket shell widthNot Available
Bottom bracket typeRace Face Evolve XC X-Type
Crankset parts and sizesRace Face Evolve XC X-Type
Gear shift leversSRAM X.9
Rear gear set 11 - 34 Teeth
9-speed

Giant Reign 1 Fork System Data

Derailleur (Front) Clamp-on
Shimano Deore XT
Derailleur (Rear)SRAM X.0
Fork material Single Crown
Aluminum and magnesium
Fork type 120 - 160 (millimeters) Adjustable Travel
Fox 36 Talas R

Other Specs of Giant Reign 1

Component group setsMountain Mix
Pedals detailsOptional
Rear shock absorber 6 (inches) Travel
Fox Float RP3
Saddle seatWTB Pure V Race
Seat post extension 30.9 (millimeters) Diameter
Race Face Deus XC


Useful links and guides ....