Merlin CRITICAL PATH 1998 VS Giant REIGN X2 2008 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Giant Reign X2 2008 comparison online with competitors

Giant Reign X2

General Infos
Model Reign X2
Manufacturer Giant
Year of production 2008
Current price Check price Here ==>   
Color choice -Anodized Olive
Sizes - Extra small
- Small
- Medium
- Large

Wheels And Breaking System

Bike front tire Rear: 26 X 2.3 (inches) WTB Prowler XT
Front: 26 X 2.3 (inches) WTB Prowler MX
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Stroker Ryde Levers
Hayes Stroker Ryde With 180 (millimeters) Rotor Front and Hayes Stroker Ryde With 160 (millimeters) Rotor Rear Brakes
Hubs for disc brakes Rear: Formula Disc
Front: Formula Disc 20 (millimeters)
Rims manufacturerWTB Dual Duty FR
Spoke nipples typeNot Available
Spoke wheel 14/15ga. Butted
Stainless Steel

Frame and Body Specs

Frame materialsALUXX SL Aluminum
Frame typeTIG-welded
Handlebar constructionRace Face Evolve AM Riser
Handlebar extenderOptional
Handlebar stem detailsRace Face Evolve AM 31.8
Headset size1 1/8 (inches) Integrated

Gearing Specifications

Bicycle chainShimano HG-73
Bottom bracket shell widthNot Available
Bottom bracket typeTruVativ Howitzer
Crankset parts and sizes 24/36 Teeth
TruVativ Ruktion 2.0
Gear shift leversSRAM X.5 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Giant Reign X2 Fork System Data

Derailleur (Front)Shimano Deore
Derailleur (Rear)SRAM X.5
Fork material Single Crown
Aluminum and magnesium
Fork type 160 (millimeters) Travel
Marzocchi 55R

Other Specs of Giant Reign X2

Component group setsMountain Mix
Pedals detailsAlloy Platform
Rear shock absorber 6.7 (inches) Travel
Marzocchi Rocco R
Saddle seatWTB Pure V Race
Seat post extension 30.9 (millimeters) Diameter
Race Face Ride XC


Useful links and guides ....