Merlin CRITICAL PATH 1998 VS Giant TRANCE X ADVANCED SL 1 2011 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
![Giant Trance X Advanced SL 1 2011 comparison online with competitors](https://yobicycle.com/images/models/Giant-Trance-X-Advanced-SL-1-2011-specs.jpg)
Giant Trance X Advanced SL 1
General InfosModel | Trance X Advanced SL 1 |
Manufacturer | Giant |
Year of production | 2011 |
Current price | Check price Here ==> |
Color choice |
-Composite and blue |
Sizes |
- Small - Medium - Large - Extra large |
Wheels And Breaking System
Bike front tire | 26 X 2.1 (inches) Kenda Nevegal |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Elixir R Levers Avid Elixir R Brakes |
Hubs for disc brakes | Rear: DT Swiss 370 SL Front: Giant Tracker |
Rims manufacturer | 32-hole DT Swiss X430 |
Spoke nipples type | Alloy |
Spoke wheel | 14/15ga. DT Swiss Competition |
Frame and Body Specs
Frame materials | Carbon |
Frame type | Bonded and monocoque |
Handlebar construction | Giant Contact SL Low-rise 31.8 |
Handlebar extender | Optional |
Handlebar stem details | Giant Contact SL |
Headset size | Not Available |
Gearing Specifications
Bicycle chain | Shimano HG74 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano External |
Crankset parts and sizes | 24/32/42 Teeth Shimano SLX |
Gear shift levers | Shimano SLX M660 Rapidfire |
Rear gear set | 11 - 36 Teeth 10-speed |
Giant Trance X Advanced SL 1 Fork System Data
Derailleur (Front) | Shimano SLX |
Derailleur (Rear) | Shimano Deore XT Shadow |
Fork material | Single |
Fork type | 120 (millimeters) Travel Fox 32 F120 RL |
Other Specs of Giant Trance X Advanced SL 1
Component group sets | Mountain Mix |
Pedals details | Optional |
Rear shock absorber | 5 (inches) Maestro Fox Float RP2 Boostvalve |
Saddle seat | Fi'zi:k Gobi XM |
Seat post extension | 30.9 (millimeters) Diameter Giant Contact |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Giant Trance X Advanced SL 1 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Giant Trance X Advanced SL 1 Mountain bike here