Merlin CRITICAL PATH 1998 VS Giant VT 2 2005 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Giant VT 2 2005 comparison online with competitors

Giant VT 2

General Infos
Model VT 2
Manufacturer Giant
Year of production 2005
Current price Check price Here ==>   
Color choice -Satin Silver and Satin Black
Sizes - 16.5 (inches)
- 18.5 (inches)
- 20.5 (inches)
- 22.5 (inches)

Wheels And Breaking System

Bike front tire26 X 2.00 (inches) Hutchinson Scorpion Airlight
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes HFX-9 Hydraulic Disc Front and Hayes HFX-9 Hydraulic Rear Levers
Hayes HFX-9 Hydraulic Disc Brakes
Hubs for disc brakesShimano Deore XT Disc
Rims manufacturer 32-hole
Mavic X223 Disc
Spoke nipples typeNot Available
Spoke wheel 14/15ga. Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materialsAluxx SL Aluminum
Frame typeTIG-welded
Handlebar constructionEaston EA50
Handlebar extenderOptional
Handlebar stem detailsEaston EA50
Headset size1 1/8 (inches) Threadless FSA Integrated

Gearing Specifications

Bicycle chain1/2 X 3/32 (inches)
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizes 22/32/44 Teeth
Race Face Evolve XC ISIS
Gear shift leversShimano Deore LX RapidFire SL
Rear gear set 11 - 34 Teeth
9-speed

Giant VT 2 Fork System Data

Derailleur (Front)Shimano Deore LX
Derailleur (Rear)Shimano Deore XT SGS
Fork material Single Crown
Aluminum and magnesium
Fork type 90 - 120 (millimeters) Adjustable Travel
Manitou Minute 1:00 SPV

Other Specs of Giant VT 2

Component group setsMountain Mix
Pedals detailsTime ATAC Alium
Rear shock absorber 5 (inches) - 5.75 (inches) Adjustable Travel
Manitou Swinger Air SPV
Saddle seatWTB Rocket V
Seat post extension 27.2 (millimeters) Diameter
Easton EA50


Useful links and guides ....