Merlin CRITICAL PATH 1998 VS Giant WARP DS1 1998 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Giant Warp DS1 1998 comparison online with competitors

Giant Warp DS1

General Infos
Model Warp DS1
Manufacturer Giant
Year of production 1998
Current price Check price Here ==>   
Color choice - matte copper
-Black and yellow
Sizes - Large
- medium
- small

Wheels And Breaking System

Bike front tire Rear: 26 X 2.10 (inches) Kenda K-856
Front: 26 X 2.10 (inches) Kenda K-837
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Aluminum Levers
Aluminum Cantilever Brakes
Hubs for disc brakesFormula Q and R
Rims manufacturer 36-hole
Hoopster
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materials6061 T6 Aluminum
Frame typeTIG-welded
Handlebar constructionAluminum
Handlebar extenderOptional
Handlebar stem detailsChromoly
Headset size1 1/8 (inches) Chin Haur CH90

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
KMC UG-50
Bottom bracket shell width68 (millimeters) English
Bottom bracket typeChin Haur CH-47
Crankset parts and sizes 24/34/42 Teeth
SR XR17
Gear shift leversGrip Shift MRX-170
Rear gear set 14 - 28 Teeth
7-speed

Giant Warp DS1 Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano Alivio Top-swing
Derailleur (Rear)Shimano STX
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy

Other Specs of Giant Warp DS1

Component group setsMountain Mix
Pedals detailsVictor VP-872N
Rear shock absorber 3.0 (inches) Travel
RST 22
Saddle seatGiant Comfort
Seat post extension 30.8 (millimeters) Diameter
Kalloy SP-242


Useful links and guides ....