Merlin CRITICAL PATH 1998 VS GT DISTORTION 2.0 2011 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |

GT Distortion 2.0
General InfosModel | Distortion 2.0 |
Manufacturer | GT |
Year of production | 2011 |
Current price | Check price Here ==> |
Color choice |
-Gray |
Sizes |
- M - L |
Wheels And Breaking System
Bike front tire | 26 X 2.35 (inches) Maxxis Minion DH |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Formula RX Levers Formula RX Disc With 180 (millimeters) Rotor Brakes |
Hubs for disc brakes | All Terra Alloy Sealed |
Rims manufacturer | 32-hole Alex SX-44 |
Spoke nipples type | Brass |
Spoke wheel | 14ga. DT Swiss Champion Stainless |
Frame and Body Specs
Frame materials | 6061-T6 Aluminum |
Frame type | Aluminum |
Handlebar construction | Gravity Maximus OS |
Handlebar extender | Optional |
Handlebar stem details | Race Face Evolve AM |
Headset size | 1 1/8 (inches) Gravity DL |
Gearing Specifications
Bicycle chain | HG73 |
Bottom bracket shell width | 73 (millimeters) |
Bottom bracket type | Shimano 2-piece |
Crankset parts and sizes | 36/22t Teeth Shimano FC-M545 |
Gear shift levers | Shimano Deore |
Rear gear set | 12 - 36 Teeth 9-speed |
GT Distortion 2.0 Fork System Data
Derailleur (Front) | Shimano SLX |
Derailleur (Rear) | Shimano SLX |
Fork material | Not Available |
Fork type | 140 (millimeters) Travel RockShox Sektor Turn Key Coil |
Other Specs of GT Distortion 2.0
Component group sets | Mountain Mix |
Pedals details | Slimline Cast |
Rear shock absorber | 112 (millimeters) Travel Fox Racing Shox Float RL |
Saddle seat | WTB Silverado Race SL |
Seat post extension | X-Fusion Hilo |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your GT Distortion 2.0 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for GT Distortion 2.0 Mountain bike here