Merlin CRITICAL PATH 1998 VS GT IDRIVE 4 1.0 2007 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


GT idrive 4 1.0 2007 comparison online with competitors

GT idrive 4 1.0

General Infos
Model idrive 4 1.0
Manufacturer GT
Year of production 2007
Current price Check price Here ==>   
Color choice -Race White
Sizes - Xsmall
- small
- mediuim
- large
- xlarge

Wheels And Breaking System

Bike front tire Rear: 26 X 2.10 (inches) Kenda Nevegal
Front: 26 X 2.35 (inches) Kenda Nevegal
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Juicy 5 Levers
Avid Juicy 5 Brakes
Hubs for disc brakesDT Swiss Onyx Disc
Rims manufacturerDT Swiss XR 455
Spoke nipples typeDT Swiss
Spoke wheel 14/15ga. Butted
DT Swiss Stainless Steel

Frame and Body Specs

Frame materials6061 aluminum c
Frame typeTIG-welded
Handlebar constructionTruVativ XR 6061
Handlebar extenderOptional
Handlebar stem detailsTruVativ XR 6061
Headset size1 1/8 (inches) Integrated FSA Integrated

Gearing Specifications

Bicycle chainShimano CN-HG73
Bottom bracket shell widthNot Available
Bottom bracket typeShimano Hollowtech II
Crankset parts and sizes 22/32/44 Teeth
Shimano Deore XT
Gear shift leversShimano Deore LX
Rear gear set 11 - 32 Teeth
9-speed

GT idrive 4 1.0 Fork System Data

Derailleur (Front)Shimano Deore XT
Derailleur (Rear)Shimano XTR High Normal
Fork material Single Crown
Aluminum and magnesium
Fork type 115 (millimeters)
RockShox Revelation 409 Dual Air

Other Specs of GT idrive 4 1.0

Component group setsMountain Mix
Pedals detailsCrank Bros Candy C
Rear shock absorber 4 (inches)
Fox Float RP2 With Rebound Adjust And Adjustable
Saddle seatFi'zi:k Gobi
Seat post extensionTruVativ Micro Adjust


Useful links and guides ....