Merlin CRITICAL PATH 1998 VS GT SENSOR 2.0 2011 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


GT Sensor 2.0 2011 comparison online with competitors

GT Sensor 2.0

General Infos
Model Sensor 2.0
Manufacturer GT
Year of production 2011
Current price Check price Here ==>   
Color choice -Green
Sizes - Extra small
- Small
- Medium
- Large

Wheels And Breaking System

Bike front tire Rear: 26 X 2.1'' Maxxis Aspen
Front: 26 X 2.35 Maxxis Aspen
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Elixer 3 Levers
Avid Elixer 3 Brakes
Hubs for disc brakesAll Terra Alloy Sealed
Rims manufacturer 32-hole
Alex XD-Sport
Spoke nipples typeBrass
Spoke wheel 15ga.
DT Swiss Champion Stainless

Frame and Body Specs

Frame materials6061-T6 Aluminum
Frame typeAluminum
Handlebar constructionCrankBrothers Cobalt 2 Riser
Handlebar extenderOptional
Handlebar stem detailsSyncros AM
Headset size1 1/8 (inches) FSA NO.16

Gearing Specifications

Bicycle chainHG74
Bottom bracket shell widthNot Available
Bottom bracket typeSram XR GXP
Crankset parts and sizes 39/26t Teeth
SRAM S1400
Gear shift leversShimano SLX
Rear gear set 11 - 36 Teeth
10-speed

GT Sensor 2.0 Fork System Data

Derailleur (Front)SRAM X.7
Derailleur (Rear)Shimano SLX
Fork materialNot Available
Fork type 120 (millimeters) Travel
RockShox Recon Gold TK Solo Air

Other Specs of GT Sensor 2.0

Component group setsMountain Mix
Pedals detailsCrank Bros Candy
Rear shock absorber 120 (millimeters) Travel
Fox Racing Shox Float RL
Saddle seatWTB Silverado Race SL
Seat post extensionAll Terra AL2014


Useful links and guides ....