Merlin CRITICAL PATH 1998 VS Haro EXTREME EX0 1999 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |

Haro Extreme EX0
General InfosModel | Extreme EX0 |
Manufacturer | Haro |
Year of production | 1999 |
Current price | Check price Here ==> |
Color choice |
- Red -2 Blue |
Sizes |
- 15.5 (inches) - 17.5 (inches) - 19.5 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 1.95 (inches) IRC Mythos XC |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Tektro RBP-379A Levers Tektro 825A Linear-pull Brakes |
Hubs for disc brakes | Rear: Shimano AceraX Front: Formula OV 31 |
Rims manufacturer | 32-hole WTB SpeedMaster |
Spoke nipples type | Brass Nipples |
Spoke wheel | 2.0 (millimeters) Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | 7005 aluminum c |
Frame type | TIG-welded |
Handlebar construction | Haro Riser |
Handlebar extender | Optional |
Handlebar stem details | Haro |
Headset size | 1 1/8 (inches) Threadless Aheadset SE-1 |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG31 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 107 (millimeters) Spindle YST BB 969 |
Crankset parts and sizes | 22/32/42 Teeth SR XR32 |
Gear shift levers | Shimano STX RapidFire SL |
Rear gear set | 11 - 28 Teeth 7-speed |
Haro Extreme EX0 Fork System Data
Derailleur (Front) | Top-pull and bottom Bracket Mount Shimano Alivio Top-swing |
Derailleur (Rear) | Shimano Alivio |
Fork material | Triple-clamp Crown Aluminum and chromoly |
Fork type | 2.5 (inches) Travel RST 281 |
Other Specs of Haro Extreme EX0
Component group sets | Shimano Alivio |
Pedals details | Resin Body and aluminum Cage With Clips & Straps |
Rear shock absorber | 4.0 (inches) Travel RST 22 |
Saddle seat | Hollow Chromoly Rails With Kevlar Sides WTB SSTK |
Seat post extension | 31.6 (millimeters) Diameter Haro Micro-adjust |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Haro Extreme EX0 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Haro Extreme EX0 Mountain bike here