Merlin CRITICAL PATH 1998 VS Haro EXTREME X3 2004 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Haro Extreme X3 2004 comparison online with competitors

Haro Extreme X3

General Infos
Model Extreme X3
Manufacturer Haro
Year of production 2004
Current price Check price Here ==>   
Color choice -Not found
Sizes - Extra small
- Small
- Medium
- Large

Wheels And Breaking System

Bike front tire Rear: 26 X 2.35 (inches) Maxxis Dynomite
Front: 26 X 2.35 (inches) Maxxis Ignitor
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes HFX-9 Hydraulic Levers
Hayes HFX-9 Hydraulic Disc Brakes
Hubs for disc brakesFormula Disc
Rims manufacturer 32-hole
Sun Rims Single Track
Spoke nipples typeBrass Nipples
Spoke wheel 14ga. Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materials7005 aluminum c
Frame typeTIG-welded
Handlebar constructionTruVativ Hussefelt
Handlebar extenderOptional
Handlebar stem detailsAluminum Ahead Type
Headset size1 1/8 (inches) Threadless WTB Inner Peace ST

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG53
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizesNot Available
Gear shift leversShimano Deore RapidFire SL
Rear gear set 11 - 34 Teeth
9-speed

Haro Extreme X3 Fork System Data

Derailleur (Front)Not Available
Derailleur (Rear)Not Available
Fork material Single Crown
Aluminum
Fork type 110 (millimeters) Travel
Marzocchi DJ 2

Other Specs of Haro Extreme X3

Component group setsMountain Mix
Pedals detailsNot Available
Rear shock absorber 5.0 (inches) Travel
Fox Vanilla R
Saddle seatSDG I-Beam
Seat post extension 30.9 (millimeters) Diameter
SDG I-Beam


Useful links and guides ....