Merlin CRITICAL PATH 1998 VS Haro WERX 7 2005 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
![Haro Werx 7 2005 comparison online with competitors](https://yobicycle.com/images/models/Haro-Werx-7-2005-specs.jpg)
Haro Werx 7
General InfosModel | Werx 7 |
Manufacturer | Haro |
Year of production | 2005 |
Current price | Check price Here ==> |
Color choice |
-Not found |
Sizes |
- Not available |
Wheels And Breaking System
Bike front tire | 26 X 2.50 (inches) Maxxis Minion DH |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Hayes Hydraulic Levers Hayes HFX-9 Hydraulic Disc Brakes |
Hubs for disc brakes | Rear: Pivit 9 12 (millimeters) Front: Pivit 9 20 (millimeters) |
Rims manufacturer | 32-hole Sun Rims Doubletrack |
Spoke nipples type | Brass Nipples |
Spoke wheel | 14ga. Straight Gauge DT Swiss Stainless Steel |
Frame and Body Specs
Frame materials | 6061 T6 Aluminum |
Frame type | TIG-welded |
Handlebar construction | TruVativ Holzfeller |
Handlebar extender | Optional |
Handlebar stem details | TruVativ Holzfeller |
Headset size | 1 1/8 (inches) Threadless FSA Orbit Xtreme |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-HG73 |
Bottom bracket shell width | Not Available |
Bottom bracket type | TruVativ Gigapipe Team DH ISIS |
Crankset parts and sizes | 22/32 Teeth TruVativ Holzfeller |
Gear shift levers | Shimano Deore XT Rapidfire |
Rear gear set | 11 - 34 Teeth 9-speed |
Haro Werx 7 Fork System Data
Derailleur (Front) | Shimano Deore LX |
Derailleur (Rear) | Shimano Deore XT |
Fork material | Single Crown Aluminum |
Fork type | 170 (millimeters) Manitou Breakout Plus |
Other Specs of Haro Werx 7
Component group sets | Mountain Mix |
Pedals details | Pivit Platform |
Rear shock absorber | 7 (inches) Travel Manitou Swinger Coil 4-Way |
Saddle seat | SDG F.R.D I-Beam |
Seat post extension | 30.9 (millimeters) Diameter SDG F.R.D I-Beam |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Haro Werx 7 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Haro Werx 7 Mountain bike here