Merlin CRITICAL PATH 1998 VS Ibis MOJO SL XTR 2011 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Ibis Mojo SL XTR 2011 comparison online with competitors

Ibis Mojo SL XTR

General Infos
Model Mojo SL XTR
Manufacturer Ibis
Year of production 2011
Current price Check price Here ==>   
Color choice - Eddy Orabge
- Nuclear Pesto
- Trans Blue
- White
-Matte Clear
Sizes - Small
- Medium
- Large
- X-Large

Wheels And Breaking System

Bike front tire Rear: 26 X 2.4 (inches) WTB Mutano Race
Front: 26 X 2.3 (inches) WTB Weirwolf Race
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Formula R1 Levers
Formula R1 180 (millimeters) Front and Formula R1 160 (millimeters) Rear Brakes
Hubs for disc brakesStans ZTR
Rims manufacturerStan's Crest
Spoke nipples typeNot Available
Spoke wheelNot Available

Frame and Body Specs

Frame materialsCarbon Fiber
Frame typeCarbon Monocoque
Handlebar constructionEaston EC70 XC
Handlebar extenderNot Available
Handlebar stem detailsIbis 3D Forged
Headset size1 1/8 (inches) Cane Creek IS3

Gearing Specifications

Bicycle chainNot Available
Bottom bracket shell widthNot Available
Bottom bracket typeShimano XTR
Crankset parts and sizes 42/32/24t Or 40/28t Teeth
Shimano XTR M980
Gear shift leversShimano XTR M980
Rear gear set 11 - 36 Teeth
10-speed

Ibis Mojo SL XTR Fork System Data

Derailleur (Front)Shimano XTR
Derailleur (Rear)Shimano XTR M980
Fork material Single Crown Crown
Aluminum and magnesium
Fork type 140 (millimeters) Travel
Fox Float 32 RLC 15 (millimeters)

Other Specs of Ibis Mojo SL XTR

Component group setsShimano XTR Mix
Pedals detailsNo Pedals
Rear shock absorber 140 (millimeters) Travel
Fox Float RP23
Saddle seatWTB Rocket V Ti
Seat post extension 31.6 (millimeters) Diameter
Easton EC90


Useful links and guides ....