Merlin CRITICAL PATH 1998 VS Ibis SZAZBO SST 1995 specs comparison

🔥 Compare prices & customer reviews on Amazon
✔ Free shipping on many items • ✔ Easy returns • ✔ Trusted store
➜ Merlin Critical Path price ➜ Ibis Szazbo SST price
Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price 🛒 View Price →     
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Ibis Szazbo SST 1995 comparison online with competitors

Ibis Szazbo SST

General Infos
Model Szazbo SST
Manufacturer Ibis
Year of production 1995
Current price 🛒 View Price →     
Color choice -Red
Sizes - 15.5 (inches)
- 17 (inches)
- 18.5 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Ritchey Z-Max SC WCS
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Ritchey Logic Levers
Dia-Compe 987 Brakes
Hubs for disc brakesWhite Industries
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 1.8 (millimeters) Double Butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials Double-butted
Heat-treated
6061 T6 Aluminum
Frame typeWelded Aluminum
Handlebar constructionIbis Titanium
Handlebar extenderOptional
Handlebar stem detailsOptional
Headset size1 1/8 (inches) King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Union 915
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizes 24/34/46 Teeth
Kooka
Gear shift leversGrip Shift SRT-800 X-Ray
Rear gear set 12 - 32 Teeth
8-speed

Ibis Szazbo SST Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR
Fork material Triple-clamp Crown
Magnesium
Fork typeRock Shox Judy SL

Other Specs of Ibis Szazbo SST

Component group setsSST
Pedals detailsOnza HO
Rear shock absorberNot Available
Saddle seatRitchey Vector
Seat post extension 28.6 (millimeters) Diameter
Syncros Pro Series Aluminum


Useful links and guides ....