Merlin CRITICAL PATH 1998 VS Iron Horse 7POINT5 2005 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Iron Horse 7Point5 2005 comparison online with competitors

Iron Horse 7Point5

General Infos
Model 7Point5
Manufacturer Iron Horse
Year of production 2005
Current price Check price Here ==>   
Color choice -Not found
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire Rear: 26 X 2.50 (inches) Maxxis High Roller
Front: 26 X 2.70 (inches) Maxxis High Roller
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes HFX-9 HD Front and Hayes HFX-9 Hydraulic Rear Levers
Hayes HFX-9 Hydraulic Disc Front and Hayes HFX-9 HD Rear Brakes
Hubs for disc brakesWTB Laser Disc
Rims manufacturer 32-hole
Mavic EX 325 Disc
Spoke nipples typeNot Available
Spoke wheel 14ga. Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materialsAluminum
Frame typeTIG-welded
Handlebar constructionEaston EA50
Handlebar extenderNot Available
Handlebar stem detailsSIC Direct Mount
Headset size1 1/2 (inches) Threadless Steel Zero Stack

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG73
Bottom bracket shell widthNot Available
Bottom bracket typeFSA Platinum Pro DH
Crankset parts and sizes 26/34 Teeth
FSA V-Drive Extreme
Gear shift leversSRAM X.9
Rear gear set 11 - 34 Teeth
9-speed

Iron Horse 7Point5 Fork System Data

Derailleur (Front)Shimano Saint
Derailleur (Rear)SRAM ESP X.9
Fork material Dual Crown
Aluminum and magnesium
Fork type 130 - 170 (millimeters) Adjustable Travel
Rock Shox Boxxer U-Turn

Other Specs of Iron Horse 7Point5

Component group setsMountain Mix
Pedals detailsF.u.n.n. Vipers
Rear shock absorber 7 (inches) Travel
Progressive 5th Element 3-Way
Saddle seatSDG FRD I-Beam
Seat post extensionSDG I-Beam


Useful links and guides ....