Merlin CRITICAL PATH 1998 VS Iron Horse AZURE WORLD CUP 2007 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Iron Horse Azure World Cup 2007 comparison online with competitors

Iron Horse Azure World Cup

General Infos
Model Azure World Cup
Manufacturer Iron Horse
Year of production 2007
Current price Check price Here ==>   
Color choice -Not found
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
- 21 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Maxxis Crossmark 120TPI
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Juicy Ultimate Levers
Avid Juicy Ultimate With 6 (inches) Rotor Brakes
Hubs for disc brakesDT Swiss 1540
Rims manufacturerDT Swiss 1540
Spoke nipples typeNot Available
Spoke wheelDT Swiss 1540

Frame and Body Specs

Frame materialsAluminum
Frame typeTIG-welded
Handlebar construction Low Rise
Easton EC70 Monkey Lite CNT Carbon
Handlebar extenderOptional
Handlebar stem detailsSyntace F119
Headset size1 1/8 (inches) Integrated FSA Orbit ZS Carbon Zerostack

Gearing Specifications

Bicycle chainSRAM PC-991 With Powerlink
Bottom bracket shell width73 (millimeters) English
Bottom bracket typeRace Face Deus XC X-Type
Crankset parts and sizes 22/32/44 Teeth
Race Face Deus XC X-Type
Gear shift leversSRAM X.0 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Iron Horse Azure World Cup Fork System Data

Derailleur (Front)SRAM X.9
Derailleur (Rear)SRAM X.0
Fork material Single Crown
Carbon and aluminum and magnesium
Fork type 100 (millimeters) Travel
Rock Shox Reba World Cup

Other Specs of Iron Horse Azure World Cup

Component group setsSRAM X.0/mix
Pedals detailsCrank Brothers Egg Beater SL
Rear shock absorber 3.5 (inches) Travel
Fox Float R Air
Saddle seatSelle Italia SLR With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syntace Carbon


Useful links and guides ....