Merlin CRITICAL PATH 1998 VS Iron Horse GINSU 2000 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Iron Horse Ginsu 2000 comparison online with competitors

Iron Horse Ginsu

General Infos
Model Ginsu
Manufacturer Iron Horse
Year of production 2000
Current price Check price Here ==>   
Color choice -Lime Green and Silver
Sizes - Large
- medium
- small

Wheels And Breaking System

Bike front tire Rear: 26 X 1.95 (inches) Maxxis Instinct
Front: 26 X 2.10 (inches) Maxxis Instinct
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Koski #2520 Power Curve Levers
RST DX-1 Disc Brake Front and Koski #2420 Precision Trac Rear Brakes
Hubs for disc brakesFormula Disc
Rims manufacturer 36-hole
Sun Rims Ditch Witch
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materials7005 aluminum c
Frame typeTIG-welded
Handlebar constructionLeadtec Aluminum Riser
Handlebar extenderOptional
Handlebar stem detailsLeadtec Aluminum
Headset size1 1/8 (inches) Threadless WTB Momentum Comp ST

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
KMC Z9200
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 110 (millimeters) Spindle
Shimano BB-UN40
Crankset parts and sizes 22/32/44 Teeth
Shimano Deore
Gear shift leversShimano Deore
Rear gear set 11 - 32 Teeth
9-speed

Iron Horse Ginsu Fork System Data

Derailleur (Front) Clamp-on 34.9 (millimeters)
Shimano Deore LX Top-swing
Derailleur (Rear)Shimano Deore LX SGS
Fork material Double Triple-clamp Crown
Aluminum and magnesium
Fork type 4.0 (inches) Travel
RST Ga (millimeters)a-XT

Other Specs of Iron Horse Ginsu

Component group setsMountain Mix
Pedals detailsVictor VP-136 Clipless
Rear shock absorber 4.0 (inches) Travel
RST 22A
Saddle seatIron Horse Racing Double Density
Seat post extensionKalloy SP-263B


Useful links and guides ....