Merlin CRITICAL PATH 1998 VS Iron Horse HOLLOWPOINT 2002 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
![Iron Horse Hollowpoint 2002 comparison online with competitors](https://yobicycle.com/images/models/Iron-Horse-Hollowpoint-2002-specs.jpg)
Iron Horse Hollowpoint
General InfosModel | Hollowpoint |
Manufacturer | Iron Horse |
Year of production | 2002 |
Current price | Check price Here ==> |
Color choice |
-Red |
Sizes |
- Large - medium - small |
Wheels And Breaking System
Bike front tire | 26 X 2.00 (inches) Hutchinson Python Tubeless |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Hayes Hydraulic Disc Levers Hayes Hydraulic Disc Brakes |
Hubs for disc brakes | Mavic Crossroc Disc |
Rims manufacturer | 24-hole Mavic Crossroc UST Disc |
Spoke nipples type | Brass Nipples |
Spoke wheel | 14/16/15ga. Double-butted Mavic Stainless Steel |
Frame and Body Specs
Frame materials | Double-butted 6061 T6 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Answer Hyperlite |
Handlebar extender | Optional |
Handlebar stem details | Titec Fast Al |
Headset size | 1 1/8 (inches) Threadless Cane Creek S-2 |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-HG92 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 113 (millimeters) Spindle Shimano BB-ES70 |
Crankset parts and sizes | 22/32/44 Teeth Shimano Deore XT |
Gear shift levers | SRAM 9.0 SL Half Pipe |
Rear gear set | 11 - 32 Teeth 9-speed |
Iron Horse Hollowpoint Fork System Data
Derailleur (Front) | Top-pull and clamp-on 31.8 (millimeters) Shimano Deore XT Top-swing |
Derailleur (Rear) | SRAM ESP 9.0 SL |
Fork material | Single Triple-clamp Crown Aluminum |
Fork type | 4.0 (inches) Travel Answer Manitou Black Super Air |
Other Specs of Iron Horse Hollowpoint
Component group sets | Mountain Mix |
Pedals details | Shimano PD-M858 SPD |
Rear shock absorber | 4.5 (inches) Travel Rock Shox Sid Race |
Saddle seat | Titanium Rails Selle Italia Flite Gel |
Seat post extension | 26.8 (millimeters) Diameter Titec X-Wing Pro |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Iron Horse Hollowpoint manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Iron Horse Hollowpoint Mountain bike here