Merlin CRITICAL PATH 1998 VS Iron Horse SACHEM 4.0 2008 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Iron Horse Sachem 4.0 2008 comparison online with competitors

Iron Horse Sachem 4.0

General Infos
Model Sachem 4.0
Manufacturer Iron Horse
Year of production 2008
Current price Check price Here ==>   
Color choice -Black Satin
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.3 (inches) WTB Prowler XT
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano M485 Levers
Shimano M485 With 180 (millimeters) Rotor Brakes
Hubs for disc brakesAlloy Disc
Rims manufacturer 32-hole
WTB Dual Duty FR
Spoke nipples typeNot Available
Spoke wheel 14ga.
Stainless Steel

Frame and Body Specs

Frame materialsNot Available
Frame typeTIG-welded
Handlebar constructionAlloy Riser
Handlebar extenderOptional
Handlebar stem detailsAlloy All Mountain OS
Headset size1 1/8 (inches) FSA No 10

Gearing Specifications

Bicycle chainKMC Z72
Bottom bracket shell width73 (millimeters)
Bottom bracket type 118 (millimeters) Spindle
FSA Powerdrive
Crankset parts and sizes 22/32 Teeth
FSA Dyna Drive
Gear shift leversSRAM X.5
Rear gear set 11 - 32 Teeth
8-speed

Iron Horse Sachem 4.0 Fork System Data

Derailleur (Front)Shimano Altus
Derailleur (Rear)SRAM X.5
Fork materialSingle
Fork type 160 (millimeters) Travel
Marzocchi Z.1 Sport

Other Specs of Iron Horse Sachem 4.0

Component group setsMountain Mix
Pedals detailsWellgo Alloy Platform
Rear shock absorber 6 (inches) Travel
Fox Vanilla R
Saddle seatWTB Pure V Sport
Seat post extension 30.0 (millimeters) Diameter
Alloy


Useful links and guides ....