Merlin CRITICAL PATH 1998 VS Iron Horse SUNDAY ELITE 2008 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Iron Horse Sunday Elite
General InfosModel | Sunday Elite |
Manufacturer | Iron Horse |
Year of production | 2008 |
Current price | Check price Here ==> |
Color choice |
-Black Satin |
Sizes |
- 16 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.50 (inches) Maxxis Minion DHF 3C Front: 26 X 2.70 (inches) Maxxis Minion DHF 3C |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Code Levers Avid Code With 203 (millimeters) Rotor Brakes |
Hubs for disc brakes | Sun ADD |
Rims manufacturer | 32-hole Sun ADD |
Spoke nipples type | Not Available |
Spoke wheel | 15/14ga. DT Competition Stainless Steel |
Frame and Body Specs
Frame materials | 6069 aluminum c |
Frame type | TIG-welded |
Handlebar construction | Funn Fatboy |
Handlebar extender | Optional |
Handlebar stem details | FUNN Rippa OS |
Headset size | 1 1/2 (inches) FSA Orbit Extreme Pro 1.5 |
Gearing Specifications
Bicycle chain | SRAM PC-971 |
Bottom bracket shell width | 83 (millimeters) |
Bottom bracket type | FUNN External Cup |
Crankset parts and sizes | 36 Teeth FUNN Hooka |
Gear shift levers | SRAM X.9 |
Rear gear set | 11 - 26 Teeth 9-speed |
Iron Horse Sunday Elite Fork System Data
Derailleur (Front) | Chain Retention Device E-13 STS Guide With 36T Bashguard |
Derailleur (Rear) | SRAM X.9 Short Cage |
Fork material | Single Crown Aluminum |
Fork type | 180 (millimeters) Travel RockShox Totem Solo Air |
Other Specs of Iron Horse Sunday Elite
Component group sets | Downhill Mix |
Pedals details | Crank Brothers 5050x |
Rear shock absorber | 8 (inches) Travel Marzocchi Rocco World Cup |
Saddle seat | WTB Pure V Race |
Seat post extension | 30.0 (millimeters) Diameter Funn Splined V3 |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Iron Horse Sunday Elite manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Iron Horse Sunday Elite Mountain bike here