Merlin CRITICAL PATH 1998 VS Jamis PARKER 1.0 2008 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Jamis Parker 1.0
General InfosModel | Parker 1.0 |
Manufacturer | Jamis |
Year of production | 2008 |
Current price | Check price Here ==> |
Color choice |
-Sludge |
Sizes |
- Small - medium - large |
Wheels And Breaking System
Bike front tire | 26 X 2.40 (inches) WTB Motoraptor |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | 160 (millimeters) Rotor Rear Brakes 180 (millimeters) Rotor Front and Tektro Auriga Comp Hydraulic Tektro Auriga Hydraulic Levers Tektro Auriga Comp Hydraulic |
Hubs for disc brakes | Rear: Shimano FH-M475 Disc Front: WTB 20 (millimeters) |
Rims manufacturer | WTB Dual Duty Freeride |
Spoke nipples type | Not Available |
Spoke wheel | 14ga. Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | 7005 aluminum c |
Frame type | TIG-welded |
Handlebar construction | Easton EA30 Monkeybar |
Handlebar extender | Not Available |
Handlebar stem details | Easton Vice 31.8 (millimeters) |
Headset size | 1 1/8 (inches) Threadless Aheadset Zero-Stack |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) KMC Z9000 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 113 (millimeters) Spindle Shimano ES25 |
Crankset parts and sizes | 22/32/44 Teeth Shimano FCM-442 |
Gear shift levers | Shimano Deore |
Rear gear set | 11 - 32 Teeth 9-speed |
Jamis Parker 1.0 Fork System Data
Derailleur (Front) | Clamp On 34.9 (millimeters) Suntour XRC-414 |
Derailleur (Rear) | Shimano Deore |
Fork material | Single |
Fork type | 85-130 (millimeters) RockShox Recon 351 |
Other Specs of Jamis Parker 1.0
Component group sets | Mountain Mix |
Pedals details | Flatbed Alloy Platform |
Rear shock absorber | 100 (millimeters) Travel RockShox BAR 2.1 |
Saddle seat | WTB Pure V |
Seat post extension | 31.6 (millimeters) Diameter Easton EA30 |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Jamis Parker 1.0 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Jamis Parker 1.0 Mountain bike here