Merlin CRITICAL PATH 1998 VS KHS COMP ST 1999 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


KHS Comp ST 1999 comparison online with competitors

KHS Comp ST

General Infos
Model Comp ST
Manufacturer KHS
Year of production 1999
Current price Check price Here ==>   
Color choice -Orange
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
- 21 (inches)

Wheels And Breaking System

Bike front tire26 X 1.95 (inches) IRC Mythos XC
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Power Tools 1000 Levers
Power Tools 1000 Brakes
Hubs for disc brakes Rear: Shimano STX-RC
Front: Power Tools
Rims manufacturer 32-hole
Sun Rims ZJ-18
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Straight Gauge
Shuhn Lih Steel

Frame and Body Specs

Frame materials Double-butted
Chromoly
Frame typeTIG-welded
Handlebar constructionKalloy Aluminum
Handlebar extenderPower Tools
Handlebar stem detailsPower Tools
Headset size1 1/8 (inches) Threadless Tioga TG

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
KMC SS-82
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 110 (millimeters) Spindle
Shimano BB-UN52
Crankset parts and sizes 22/32/42 Teeth
Tracer Safari
Gear shift leversShimano STX-RC RapidFire SL
Rear gear set 11 - 30 Teeth
8-speed

KHS Comp ST Fork System Data

Derailleur (Front) Top-pull and clamp-on 28.6 (millimeters)
Shimano STX-RC Top-swing
Derailleur (Rear)Shimano Deore LX SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork type 3.15 (inches) Travel
Answer Manitou Spyder R

Other Specs of KHS Comp ST

Component group setsMountain Mix
Pedals detailsVictor VP-108 Clipless
Rear shock absorber 1.0 (inches) Travel
Shock Works
Saddle seatVelo VL-354
Seat post extension 26.8 (millimeters) Diameter
Kalloy SP-339


Useful links and guides ....