Merlin CRITICAL PATH 1998 VS KHS WITCH DOCTOR 2002 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


KHS Witch Doctor 2002 comparison online with competitors

KHS Witch Doctor

General Infos
Model Witch Doctor
Manufacturer KHS
Year of production 2002
Current price Check price Here ==>   
Color choice -Black and Grey
Sizes - 16 (inches)

Wheels And Breaking System

Bike front tire26 X 2.35 (inches) Maxxis High Roller
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Magura Julie Levers
Magura Julie Hydraulic Disc Brakes
Hubs for disc brakesPowerTools Alloy
Rims manufacturer 32-hole
Sun Rims Ditch Witch
Spoke nipples typeBrass Nipples
Spoke wheel 14ga. Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materials7005 aluminum c
Frame typeTIG-welded
Handlebar constructionPowerTools DH
Handlebar extenderOptional
Handlebar stem detailsForged Aluminum
Headset size1 1/8 (inches) FSA The Pig

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
KMC Z9000
Bottom bracket shell width68 (millimeters) English
Bottom bracket typeTruVativ Sealex XR-XC
Crankset parts and sizes 22/32/44 Teeth
TruVativ Hussefelt
Gear shift leversSRAM Attack 9.0
Rear gear set 11 - 34 Teeth
9-speed

KHS Witch Doctor Fork System Data

Derailleur (Front) Clamp-on
Shimano Deore
Derailleur (Rear)Shimano Deore
Fork material Single Triple-clamp Crown
Aluminum
Fork type 5.0 (inches) Travel
Rock Shox Pyslo XC

Other Specs of KHS Witch Doctor

Component group setsMountain Mix
Pedals details Aluminum
Platform
Rear shock absorber 4.5 (inches) Travel
Romic
Saddle seatVelo
Seat post extensionChromoly


Useful links and guides ....