Merlin CRITICAL PATH 1998 VS Kona DAWG 2005 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Kona Dawg 2005 comparison online with competitors

Kona Dawg

General Infos
Model Dawg
Manufacturer Kona
Year of production 2005
Current price Check price Here ==>   
Color choice -Platinum and Black
Sizes - 15 (inches)
- 17 (inches)
- 18 (inches)
- 19 (inches)
- 22 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Nokian NBT
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes HFX-9 XC Levers
Hayes HFX-9 XC Brakes
Hubs for disc brakes Rear: Shimano FH-M475 Disc
Front: KK Disc
Rims manufacturer 32-hole
Sun Rims DS2-XC
Spoke nipples typeBrass Nipples
Spoke wheel 14ga. Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materials7005 aluminum c
Frame typeTIG-welded
Handlebar constructionTruVativ LE
Handlebar extenderNot Available
Handlebar stem detailsTruVativ XR 3D
Headset size1 1/8 (inches) Threadless Aheadset STS

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG53
Bottom bracket shell widthNot Available
Bottom bracket typeRace Face SRX ISIS
Crankset parts and sizes 22/32/44 Teeth
Race Face Ride XC ISIS
Gear shift leversShimano Deore RapidFire
Rear gear set 11 - 32 Teeth
9-speed

Kona Dawg Fork System Data

Derailleur (Front) Top-pull
Shimano Deore
Derailleur (Rear)Shimano Deore XT SGS
Fork material Single Crown
Aluminum
Fork type 120 (millimeters) Travel
Marzocchi FXR Pro

Other Specs of Kona Dawg

Component group setsMountain Mix
Pedals detailsShimano PD-M505 SPD
Rear shock absorberFox Float R
Saddle seatWTB Speed V Comp
Seat post extensionTruVativ XR Single Clamp


Useful links and guides ....