Merlin CRITICAL PATH 1998 VS Kona DAWG DELUXE 2006 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
![Kona Dawg Deluxe 2006 comparison online with competitors](https://yobicycle.com/images/models/Kona-Dawg-Deluxe-2006-specs.jpg)
Kona Dawg Deluxe
General InfosModel | Dawg Deluxe |
Manufacturer | Kona |
Year of production | 2006 |
Current price | Check price Here ==> |
Color choice |
-Blue |
Sizes |
- S(15) (inches) - M(17) (inches) - L(18) (inches) - XL (inches) - XXL (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.30 (inches) Nokian NBT |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Hayes Hydraulic HFX-9 XC Levers Hayes Hydraulic HFX-9 XC Brakes |
Hubs for disc brakes | Rear: Shimano FH-M475 Disc Front: KK Disc |
Rims manufacturer | Sun S.O.S. P1 |
Spoke nipples type | Not Available |
Spoke wheel | 14ga. Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | 5 (inches) Travel Kona Clump Light 7005 Butted Aluminum |
Frame type | TIG-welded |
Handlebar construction | Truvativ LE OS Riser |
Handlebar extender | Optional |
Handlebar stem details | Truvativ XR 3D OS |
Headset size | Aheadset STS |
Gearing Specifications
Bicycle chain | Shimano CN-HG53 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Race Face SRX ISIS |
Crankset parts and sizes | 22/32/44 Teeth Race Face Ride XC ISIS |
Gear shift levers | Shimano Deore |
Rear gear set | 11 - 32 Teeth 9-speed |
Kona Dawg Deluxe Fork System Data
Derailleur (Front) | Shimano Deore |
Derailleur (Rear) | Shimano Deore XT |
Fork material | Single Crown Aluminum and magnesium |
Fork type | Marzocchi Fond Race 1 Lock-Up |
Other Specs of Kona Dawg Deluxe
Component group sets | Mountain Mix |
Pedals details | Shimano PD-M505 Clipless |
Rear shock absorber | 5 (inches) Travel Fox Float R |
Saddle seat | WTB Speed V Comp |
Seat post extension | Truvativ XR |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Kona Dawg Deluxe manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Kona Dawg Deluxe Mountain bike here