Merlin CRITICAL PATH 1998 VS Kona DAWG PRIMO 2006 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Kona Dawg Primo 2006 comparison online with competitors

Kona Dawg Primo

General Infos
Model Dawg Primo
Manufacturer Kona
Year of production 2006
Current price Check price Here ==>   
Color choice -Green
Sizes - S(15) (inches)
- M(17) (inches)
- L(18) (inches)
- XL (inches)
- XXL (inches)

Wheels And Breaking System

Bike front tire26 X 2.30 (inches) Nokian NBT
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Hydraulic HFX-9 XC Levers
Hayes Hydraulic HFX-9 XC Brakes
Hubs for disc brakes Rear: Shimano FH-M525 Disc
Front: Shimano HB-M525 Disc
Rims manufacturerSun S.O.S. Welded
Spoke nipples typeNot Available
Spoke wheel 14ga. Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materials 5 (inches) Travel
Kona Clump Butted Aluminum
Frame typeTIG-welded
Handlebar constructionRace Face Evolve DH OS Riser
Handlebar extenderOptional
Handlebar stem detailsRace Face Evolve XC
Headset sizeAheadset STS

Gearing Specifications

Bicycle chainShimano CN-HG53
Bottom bracket shell widthNot Available
Bottom bracket typeRace Face Evolve XC X-Type
Crankset parts and sizes 22/32/44 Teeth
Race Face Evolve XC X-Type
Gear shift leversShimano Deore LX
Rear gear set 11 - 32 Teeth
9-speed

Kona Dawg Primo Fork System Data

Derailleur (Front)Shimano Deore LX
Derailleur (Rear)Shimano Deore XT
Fork material Single Crown
Aluminum and magnesium
Fork typeFox Float RP3

Other Specs of Kona Dawg Primo

Component group setsMountain Mix
Pedals detailsShimano PD-M520 Clipless
Rear shock absorber 5 (inches) Travel
FOX Float R
Saddle seatWTB Laser V Race
Seat post extensionIRD Quad 2


Useful links and guides ....