Merlin CRITICAL PATH 1998 VS Kona FOUR DELUXE 2008 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Kona Four Deluxe 2008 comparison online with competitors

Kona Four Deluxe

General Infos
Model Four Deluxe
Manufacturer Kona
Year of production 2008
Current price Check price Here ==>   
Color choice -Silver and White and Black
Sizes - 15 (inches)
- 17 (inches)
- 18 (inches)
- 19 (inches)
- 20 (inches)
- 22 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Maxxis Ignitor
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Stroker Trail Hydraulic Levers
Hayes Stroker Trail With V6 Rotor Brakes
Hubs for disc brakes Rear: Shimano M525 Disc
Front: KK Disc
Rims manufacturerSun Eq 2.1SL
Spoke nipples typeNot Available
Spoke wheel 15ga.
DT Swiss Stainless Steel

Frame and Body Specs

Frame materialsKona Race Light Scandium Butted
Frame typeTIG-welded
Handlebar constructionKona XC and BC
Handlebar extenderOptional
Handlebar stem detailsKona XC and BC
Headset sizeTH

Gearing Specifications

Bicycle chainShimano HG53-9
Bottom bracket shell widthNot Available
Bottom bracket typeFSA Mega EXO
Crankset parts and sizes 22/32/44 Teeth
FSA Moto MegaExo
Gear shift leversShimano Deore
Rear gear set 11 - 32 Teeth
9-speed

Kona Four Deluxe Fork System Data

Derailleur (Front)Shimano Deore
Derailleur (Rear)Shimano XT Shadow
Fork material Single Crown
Aluminum and magnesium
Fork type 100 (millimeters) Travel
RockShox Recon SL

Other Specs of Kona Four Deluxe

Component group setsMountain Mix
Pedals detailsShimano PD-M505
Rear shock absorber 4 (inches) Travel
Fox Float RP2
Saddle seatWTB Rocket V Como
Seat post extensionKona XC and BC


Useful links and guides ....