Merlin CRITICAL PATH 1998 VS Kona STAB 1999 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
![Kona Stab 1999 comparison online with competitors](https://yobicycle.com/images/models/Kona-Stab-1999-specs.jpg)
Kona Stab
General InfosModel | Stab |
Manufacturer | Kona |
Year of production | 1999 |
Current price | Check price Here ==> |
Color choice |
-Bomber Red and Black |
Sizes |
- Long - medium - small |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) Tioga Factory DH |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid SD-1.9 L Levers Avid Arch Rival 50 Brakes |
Hubs for disc brakes | Rear: Shimano Deore LX Front: Ritchey Pro S |
Rims manufacturer | Sun Rims Rhyno Lite |
Spoke nipples type | Not Available |
Spoke wheel | 2.0 (millimeters) Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | Kona DH 7005 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Kona DH Riser |
Handlebar extender | Optional |
Handlebar stem details | Kona OB |
Headset size | 1 1/8 (inches) Threadless Aheadset SX |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-HG72 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | Shimano BB-UN52 |
Crankset parts and sizes | 46 Teeth Race Face Turbine DH |
Gear shift levers | Shimano Deore LX RapidFire SL Rear |
Rear gear set | 11 - 32 Teeth 9-speed |
Kona Stab Fork System Data
Derailleur (Front) | Chain Retention Device Mr. Dirt Chainguide |
Derailleur (Rear) | Shimano Deore XT SGS |
Fork material | Double Triple-clamp Crown Aluminum |
Fork type | 5.0 (inches) Travel Marzocchi Jr. T |
Other Specs of Kona Stab
Component group sets | Mountain Mix |
Pedals details | Shimano PD-M636 SPD |
Rear shock absorber | 5.65 (inches) Travel Fox Vanilla RC |
Saddle seat | SDG Big Boy DH |
Seat post extension | 30.0 (millimeters) Diameter Kona O-Beam |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Kona Stab manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Kona Stab Mountain bike here