Merlin CRITICAL PATH 1998 VS Kona STAB DELUXE 2009 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Kona Stab Deluxe
General InfosModel | Stab Deluxe |
Manufacturer | Kona |
Year of production | 2009 |
Current price | Check price Here ==> |
Color choice |
-Red and White |
Sizes |
- Short - medium - long |
Wheels And Breaking System
Bike front tire | 26 X 2.50 (inches) Maxxis Minion |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Hayes Stroker Ace Levers Hayes Stroker Ace With 203 (millimeters) Rotor Brakes |
Hubs for disc brakes | Rear: Sun Ringle Demon 150 X 12 (millimeters) Front: Formula DH 20 (millimeters) |
Rims manufacturer | Alex FR 32 |
Spoke nipples type | Not Available |
Spoke wheel | 14ga. Sandvic Stainless |
Frame and Body Specs
Frame materials | Kona Clump DH 7005 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Kona OB Riser |
Handlebar extender | Optional |
Handlebar stem details | Kona OB |
Headset size | 1 1/8 (inches) TH |
Gearing Specifications
Bicycle chain | Shimano Deore |
Bottom bracket shell width | 83 (millimeters) |
Bottom bracket type | Race Face X-Type |
Crankset parts and sizes | 36 Teeth Race Face Ride DH |
Gear shift levers | Shimano Deore |
Rear gear set | 11 - 32 Teeth 9-speed |
Kona Stab Deluxe Fork System Data
Derailleur (Front) | Chain Retention Device E.Thirteen SRS ST |
Derailleur (Rear) | Shimano Deore |
Fork material | Dual |
Fork type | 200 (millimeters) Travel Marzocchi 888 RCV |
Other Specs of Kona Stab Deluxe
Component group sets | Downhill Mix |
Pedals details | Kona Jackshit |
Rear shock absorber | 8 (inches) Travel Fox Van R |
Saddle seat | WTB Pure V Race |
Seat post extension | Kona OB |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Kona Stab Deluxe manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Kona Stab Deluxe Mountain bike here