Merlin CRITICAL PATH 1998 VS Kona STAB DELUXE 2006 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Kona Stab Deluxe 2006 comparison online with competitors

Kona Stab Deluxe

General Infos
Model Stab Deluxe
Manufacturer Kona
Year of production 2006
Current price Check price Here ==>   
Color choice -Fox 40 Grey and Black
Sizes - Short
- Medium
- Long

Wheels And Breaking System

Bike front tire26 X 2.70 (inches) Maxxis Minion DH
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Hydraulic HFX-9 HD V8 Levers
Hayes Hydraulic HFX-9 HD V8 Brakes
Hubs for disc brakes Rear: Sun Ringle Abbah Lawill
Front: KK Disc
Rims manufacturerSun MTX-S
Spoke nipples typeNot Available
Spoke wheel 14ga. Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materialsKona Supreme 8 Inch Travel
Frame typeTIG-welded
Handlebar constructionTruvativ Hussefelt Riser
Handlebar extenderOptional
Handlebar stem detailsTruvativ Hussefelt
Headset sizeFSA

Gearing Specifications

Bicycle chainShimano CN-HG53
Bottom bracket shell widthNot Available
Bottom bracket typeTruVativ Howitzer
Crankset parts and sizes 36 Teeth
Truvativ Hussefelt-Howitzer
Gear shift leversShimano Deore
Rear gear set 11 - 32 Teeth
9-speed

Kona Stab Deluxe Fork System Data

Derailleur (Front)Truvativ Boxguide
Derailleur (Rear)Shimano Deore LX
Fork material Dual Crown
Aluminum and magnesium
Fork typeMarzocchi 888 VF2

Other Specs of Kona Stab Deluxe

Component group setsMountain Mix
Pedals detailsKona Jackshit
Rear shock absorber 8 (inches) Travel
Fox DHX 3.0
Saddle seatWTB Power V Comp
Seat post extensionTruvativ XR Double Clamp


Useful links and guides ....