Merlin CRITICAL PATH 1998 VS Kona STINKY AIR 2009 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Kona Stinky Air 2009 comparison online with competitors

Kona Stinky Air

General Infos
Model Stinky Air
Manufacturer Kona
Year of production 2009
Current price Check price Here ==>   
Color choice -Light Blue and White
Sizes - 15 (inches)
- 15.5 (inches)
- 16 (inches)
- 16.5 (inches)
- 17 (inches)

Wheels And Breaking System

Bike front tire26 X 2.50 (inches) Maxxis Minion 3C
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano Saint Levers
Shimano Saint With 203 (millimeters) Rotor Brakes
Hubs for disc brakes Rear: Mavic CrossMax SX UST 12 (millimeters) Thru-axle
Front: Mavic CrossMax SX UST 20 (millimeters) Thru-axle
Rims manufacturerMavic Crossmax SX
Spoke nipples typeNot Available
Spoke wheelNot Available

Frame and Body Specs

Frame materialsKona Clump DH 7005 Aluminum
Frame typeTIG-welded
Handlebar constructionFSA MK230B-OS
Handlebar extenderOptional
Handlebar stem detailsFSA FR-200-OS
Headset size1 1/2 (inches) FSA Orbit Extreme Pro 1.5

Gearing Specifications

Bicycle chainShimano XT
Bottom bracket shell width73 (millimeters)
Bottom bracket typeRace Face X-Type
Crankset parts and sizes 36 Teeth
Race Face Atlas FR
Gear shift leversShimano XT Rapid Fire
Rear gear set 11 - 32 Teeth
9-speed

Kona Stinky Air Fork System Data

Derailleur (Front) Chain Retention Device
E Thirteen LG1
Derailleur (Rear)Shimano XTR Shadow
Fork materialSingle
Fork type 140-180 (millimeters)
Marzocchi 66 ATA

Other Specs of Kona Stinky Air

Component group setsFreeride Mix
Pedals detailsKona Wah-Wah
Rear shock absorber 7 (inches) Travel
Fox DHX Air 5.0
Saddle seatWTB Pure V Race FR
Seat post extensionFSA FR-270


Useful links and guides ....