Merlin CRITICAL PATH 1998 VS Kona STINKY DELUXE 2010 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Kona Stinky Deluxe 2010 comparison online with competitors

Kona Stinky Deluxe

General Infos
Model Stinky Deluxe
Manufacturer Kona
Year of production 2010
Current price Check price Here ==>   
Color choice -Black
Sizes - 15 (inches)
- 15.5 (inches)
- 16 (inches)
- 16.5 (inches)
- 17 (inches)

Wheels And Breaking System

Bike front tire26 X 2.5 (inches) Kenda Nevegal
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Code Levers
Avid Code Hydraulic With 8 (inches) Rotor Brakes
Hubs for disc brakesMavic Crossline
Rims manufacturerMavic CrossLine
Spoke nipples typeNot Available
Spoke wheelMavic CrossLine

Frame and Body Specs

Frame materialsKona Clump DH 7005 Aluminum
Frame typeTIG-welded
Handlebar constructionKona OB and DH
Handlebar extenderOptional
Handlebar stem detailsKona Clump
Headset size1 1/2 (inches) Threadless FSA Big Fat Pig

Gearing Specifications

Bicycle chainSRAM PC 951
Bottom bracket shell width73 (millimeters)
Bottom bracket typeTruVativ Ha (millimeters)erschmidt FR
Crankset parts and sizes 22 Teeth
Truvativ Ha (millimeters)erschmidt FR
Gear shift leversSRAM X-9 Trigger
Rear gear set 11 - 32 Teeth
9-speed

Kona Stinky Deluxe Fork System Data

Derailleur (Front) Internal Transmission Crank
Truvativ Ha (millimeters)erschmidt FR
Derailleur (Rear)SRAM X-9
Fork materialSingle
Fork type 180 (millimeters) Travel
Marzocchi 66 RC3 With 20 (millimeters) Axle

Other Specs of Kona Stinky Deluxe

Component group setsMountain Mix
Pedals detailsKona Wah-Wah
Rear shock absorber 7 (inches) Travel
Marzocchi Roco TST R
Saddle seatWTB Pure V Race FR
Seat post extensionKona XC and BC


Useful links and guides ....