Merlin CRITICAL PATH 1998 VS Litespeed UNICOI XTR 2003 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Litespeed Unicoi XTR 2003 comparison online with competitors

Litespeed Unicoi XTR

General Infos
Model Unicoi XTR
Manufacturer Litespeed
Year of production 2003
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 14 (inches)
- 16.5 (inches)
- 18 (inches)
- 19.5 (inches)

Wheels And Breaking System

Bike front tire26 X 2.00 (inches)
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 28-hole and 32-hole
Mavic X 3.1
Spoke nipples typeAluminum Nipples
Spoke wheel 14/15ga. Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionLitespeed Titanium
Handlebar extenderOptional
Handlebar stem detailsThomson Elite
Headset size1 1/8 (inches) Integrated Campagnolo Record Hiddenset

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-7701
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 116 (millimeters) Spindle
Shimano XTR Integral
Crankset parts and sizes 22/32/44 Teeth
Shimano XTR M960
Gear shift leversShimano XTR STI Dual Control
Rear gear set 12 - 34 Teeth
9-speed

Litespeed Unicoi XTR Fork System Data

Derailleur (Front) Top-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Single Crown
Aluminum and magnesium
Fork type 3.15 (inches)-4.00 (inches) Adjustable Travel
Rock Shox Sid Team

Other Specs of Litespeed Unicoi XTR

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber1.0 (inches) Travel
Saddle seatSelle Italia Flite
Seat post extension 27.2 (millimeters) Diameter
Thomson Elite


Useful links and guides ....