Merlin CRITICAL PATH 1998 VS Marin ATTACK TRAIL 2004 specs comparison
🔥 Compare prices & customer reviews on Amazon
✔ Free shipping on many items • ✔ Easy returns • ✔ Trusted store
➜ Merlin Critical Path price
➜ Marin Attack Trail price
Merlin Critical Path
General Infos| Model | Critical Path |
| Manufacturer | Merlin |
| Year of production | 1998 |
| Current price | 🛒 View Price → |
| Color choice | -Brushed |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
| Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
| Bike rear tire | Not Available |
| Bike wheel size | 26 (inches) Wheels |
| Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
| Hubs for disc brakes | Shimano XTR |
| Rims manufacturer | 32-holeMavic 217 SUP |
| Spoke nipples type | Alloy Nipples |
| Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
| Frame materials | 3Al and 2.5V Titanium |
| Frame type | TIG-welded |
| Handlebar construction | Syncros Hardcore |
| Handlebar extender | Optional |
| Handlebar stem details | Syncros Hardcore |
| Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
| Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
| Bottom bracket shell width | 68 (millimeters) English |
| Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
| Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
| Gear shift levers | Shimano XTR RapidFire SL |
| Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
| Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
| Derailleur (Rear) | Shimano XTR SGS |
| Fork material | Triple-clamp CrownAluminum and magnesium |
| Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
| Component group sets | Shimano XTR |
| Pedals details | Optional |
| Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
| Saddle seat | Bontrager With Titanium Rails |
| Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
Marin Attack Trail
General Infos| Model | Attack Trail |
| Manufacturer | Marin |
| Year of production | 2004 |
| Current price | 🛒 View Price → |
| Color choice | -Matte Black |
| Sizes | - 15.5 (inches)- 17.5 (inches)- 19 (inches) |
Wheels And Breaking System
| Bike front tire | 26 X 2.24 (inches) WTB MotoRaptor |
| Bike rear tire | Not Available |
| Bike wheel size | 26 (inches) Wheels |
| Brakeset type | Hayes Hydraulic Disc LeversHayes HFX Magnesium Hydraulic Disc Brakes |
| Hubs for disc brakes | WTB Laser Disc |
| Rims manufacturer | 32-holeMavic XC717 Disc |
| Spoke nipples type | Not Available |
| Spoke wheel | 15ga. Straight GaugeDT Stainless Steel |
Frame and Body Specs
| Frame materials | 6061 T6 Aluminum |
| Frame type | TIG-welded |
| Handlebar construction | DH Riser 31.8 OD |
| Handlebar extender | Optional |
| Handlebar stem details | FSA FR200 OS |
| Headset size | 1 1/8 (inches) Threadless WTB Momentum Comp AL |
Gearing Specifications
| Bicycle chain | Not Available |
| Bottom bracket shell width | Not Available |
| Bottom bracket type | Shimano Deore XT |
| Crankset parts and sizes | 22/32/44 TeethShimano Deore XT M-760 |
| Gear shift levers | Shimano Deore XT |
| Rear gear set | 11 - 32 Teeth9-speed |
Marin Attack Trail Fork System Data
| Derailleur (Front) | Shimano Deore XT |
| Derailleur (Rear) | Shimano Deore XT |
| Fork material | Single |
| Fork type | 85-125 (millimeters) Adjustable TravelFox Talas RLC |
Other Specs of Marin Attack Trail
| Component group sets | Mountain Mix |
| Pedals details | WTB MP310 |
| Rear shock absorber | Fox Float RL |
| Saddle seat | WTB Laser V Race |
| Seat post extension | Pro Alloy Micro-adjust |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Marin Attack Trail manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Marin Attack Trail Mountain bike here