Merlin CRITICAL PATH 1998 VS Marin B-17 2000 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Marin B-17 2000 comparison online with competitors

Marin B-17

General Infos
Model B-17
Manufacturer Marin
Year of production 2000
Current price Check price Here ==>   
Color choice -Fireball with Denim
Sizes - 13.5 (inches)
- 15.5 (inches)
- 17.5 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tireTioga Factory DH
Bike rear tireNot Available
Bike wheel sizeNot Available
Brakeset type Alloy Levers
Ovation Comp Linear-pull Brakes
Hubs for disc brakesOvation Pro Disc
Rims manufacturer 36-hole
Rear: Ritchey Rock Comp OCR
Front: Ritchey Rock Comp
Spoke nipples typeNot Available
Spoke wheel 2.0 (millimeters) Straight Gauge
WTB Stainless Steel

Frame and Body Specs

Frame materialsOvation 6000 Aluminum
Frame typeTIG-welded
Handlebar constructionOvation DH Riser
Handlebar extenderOptional
Handlebar stem detailsMarin CNC
Headset sizeTange-Seiki STE

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG31
Bottom bracket shell widthNot Available
Bottom bracket typeSealed Cartridge
Crankset parts and sizes 22/32/42 Teeth
Ovation Cold Forged
Gear shift leversSRAM Centera
Rear gear set 11 - 30 Teeth
8-speed

Marin B-17 Fork System Data

Derailleur (Front)Shimano Alivio
Derailleur (Rear)Shimano Deore LX SGS
Fork material Double Triple-clamp Crown
Aluminum
Fork type 4.0 (inches) Travel
In-Sync 566DH

Other Specs of Marin B-17

Component group setsMountain Mix
Pedals details Aluminum
Platform
Rear shock absorber 5.0 (inches) Travel
Fox Vanilla R
Saddle seatTioga Multi-Control XL
Seat post extension 30.0 (millimeters) Diameter
Marin Comp


Useful links and guides ....