Merlin CRITICAL PATH 1998 VS Marin EAST PEAK 5.6 2011 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Marin East Peak 5.6 2011 comparison online with competitors

Marin East Peak 5.6

General Infos
Model East Peak 5.6
Manufacturer Marin
Year of production 2011
Current price Check price Here ==>   
Color choice -White
Sizes - Extra small
- Small
- Medium
- Large

Wheels And Breaking System

Bike front tire26 X 2.2 (inches) Continental Mountain King
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Hydraulic Disc Levers
Avid Juicy 3 Disc Brakes
Hubs for disc brakesMavic CrossRide Disc
Rims manufacturer 24-hole
Mavic CrossRide Disc
Spoke nipples typeNot Available
Spoke wheelMavic CrossRide Disc

Frame and Body Specs

Frame materials6061 aluminum c
Frame typeAluminum
Handlebar constructionDouble Butted 6061 Alloy
Handlebar extenderOptional
Handlebar stem detailsMarin OS Alloy
Headset size1 1/8 (inches) FSA NO.10

Gearing Specifications

Bicycle chainShimano HG53
Bottom bracket shell widthNot Available
Bottom bracket typeShimano With Splined OctaLink
Crankset parts and sizes 44/32/22t Teeth
Shimano Deore
Gear shift leversShimano Deore
Rear gear set 11 - 34 Teeth
9-speed

Marin East Peak 5.6 Fork System Data

Derailleur (Front)Shimano Deore
Derailleur (Rear)Shimano SLX Shadow
Fork materialNot Available
Fork type 120 (millimeters) Travel
RockShox Recon Silver

Other Specs of Marin East Peak 5.6

Component group setsMountain Mix
Pedals detailsNot Available
Rear shock absorberRockShox Ario RL
Saddle seatWTB Silverado Comp
Seat post extension 30.9 (millimeters) Diameter
Comp Alloy Micro Adjust


Useful links and guides ....