Merlin CRITICAL PATH 1998 VS Marin MOUNT VISION PRO 2007 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Marin Mount Vision Pro 2007 comparison online with competitors

Marin Mount Vision Pro

General Infos
Model Mount Vision Pro
Manufacturer Marin
Year of production 2007
Current price Check price Here ==>   
Color choice -Anodized Black
Sizes - 16 (inches)
- 16.5 (inches)
- 17 (inches)
- 18.5 (inches)

Wheels And Breaking System

Bike front tire26 X 2.14 (inches) WTB MotoRaptor Race
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Disc Levers
Shimano XTR Disc Brakes
Hubs for disc brakesDT 240S Centerlock
Rims manufacturer 32-hole
Rear: Mavic XC-717
Front: Mavic XC 717
Spoke nipples typeAlloy Nipples
Spoke wheel 14/16.5/15ga. Butted
DT Swiss Super Comp Stainless Steel

Frame and Body Specs

Frame materialsHydroformed 6061 Aluminum
Frame typeTIG-welded
Handlebar constructionEaston EC70 MonkeyLite Low-rise
Handlebar extenderOptional
Handlebar stem detailsFSA OS115
Headset size1 1/8 (inches) Threadless WTB Grease Guard

Gearing Specifications

Bicycle chainShimano XTR
Bottom bracket shell widthNot Available
Bottom bracket typeShimano Hollowtech II
Crankset parts and sizes 22/32/44 Teeth
Shimano XTR
Gear shift leversShimano XTR
Rear gear set 11 - 34 Teeth
9-speed

Marin Mount Vision Pro Fork System Data

Derailleur (Front)Shimano XTR
Derailleur (Rear)Shimano XTR
Fork material Single Crown
Magnesium and aluminum
Fork type 120 (millimeters)
Fox 32 Float RLC

Other Specs of Marin Mount Vision Pro

Component group setsShimano XTR
Pedals detailsCrank Brothers Egg Beater
Rear shock absorber 5 (inches)
Fox Float RP23
Saddle seatWTB Devo Team Nicro
Seat post extension 27.2 (millimeters) Diameter
Easton EC70


Useful links and guides ....