Merlin CRITICAL PATH 1998 VS Marin QUAKE 5.0 1997 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Marin Quake 5.0 1997 comparison online with competitors

Marin Quake 5.0

General Infos
Model Quake 5.0
Manufacturer Marin
Year of production 1997
Current price Check price Here ==>   
Color choice - red and black
-Anodized silver
Sizes - 15.5 (inches)
- 17.5 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid SD-1.9 Levers
Avid SD-2.0 Brakes
Hubs for disc brakes Rear: Shimano STX
Front: Shimano STX-RC Suspension
Rims manufacturer 32-hole
WTB SpeedMaster
Spoke nipples typeBrass Nipples
Spoke wheel 1.8 (millimeters) Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materials Double-butted
6061 T6 Aluminum
Frame typeMonocoque
Handlebar constructionMarin Lite Aluminum
Handlebar extenderAluminum
Handlebar stem detailsMarin Lite Aluminum
Headset size1 1/8 (inches) Threadless Dia-Tech

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG51
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 110 (millimeters) Spindle
Shimano BB-UN72
Crankset parts and sizes 20/32/42 Teeth
White Industries
Gear shift leversShimano STX-RC RapidFire SL
Rear gear set 11 - 28 Teeth
8-speed

Marin Quake 5.0 Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano STX Top-swing
Derailleur (Rear)Shimano Deore LX SGS
Fork material Triple-clamp Crown
Aluminum
Fork typeAnswer Manitou Pro C

Other Specs of Marin Quake 5.0

Component group setsShimano Deore LX and STX
Pedals detailsVictor VP-103 Clipless
Rear shock absorber 3.9 (inches) Travel
Marin Lite Coil Over
Saddle seatRitchey Vector
Seat post extension 30.0 (millimeters) Diameter
Marin Lite Pro


Useful links and guides ....