A PHP Error was encountered

Severity: Warning

Message: fopen(/opt/alt/php73/var/lib/php/session/ci_session1e8673cd319ee7ff5d077f99cd3dfd5506283afe): failed to open stream: Disk quota exceeded

Filename: drivers/Session_files_driver.php

Line Number: 176

Backtrace:

File: /home7/manyoff1/yobicycle_public_html/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Warning

Message: session_start(): Failed to read session data: user (path: /opt/alt/php73/var/lib/php/session)

Filename: Session/Session.php

Line Number: 143

Backtrace:

File: /home7/manyoff1/yobicycle_public_html/index.php
Line: 315
Function: require_once

Merlin CRITICAL PATH 1998 VS Marin QUAKE 7.8 2009 specs and price comparison online

Merlin CRITICAL PATH 1998 VS Marin QUAKE 7.8 2009 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Marin Quake 7.8 2009 comparison online with competitors

Marin Quake 7.8

General Infos
Model Quake 7.8
Manufacturer Marin
Year of production 2009
Current price Check price Here ==>   
Color choice -White Pearl
Sizes - Small
- medium
- large

Wheels And Breaking System

Bike front tire26 X 2.50 (inches) Kenda Nevegal
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Code 5 Levers
Avid Code 5 With 203 (millimeters) Rotor Front and Avid Code 5 With 185 (millimeters) Rotor Rear Brakes
Hubs for disc brakes Rear: Sun Ringle Jumping Flea 12 (millimeters)
Front: Sun Ringle Jumping Flea DH 20 (millimeters)
Rims manufacturer 32-hole
WTB Dual Duty FR
Spoke nipples typeNot Available
Spoke wheel 14ga.
DT Swiss Stainless

Frame and Body Specs

Frame materials6061 Custom Butted and Hydraformed Aluminum
Frame typeTIG-welded
Handlebar constructionSyncros FR 2014 Alloy OS
Handlebar extenderOptional
Handlebar stem detailsSyncros FR
Headset size1 1/2 (inches) FSA Orbit DL

Gearing Specifications

Bicycle chainSRAM PC 951
Bottom bracket shell widthNot Available
Bottom bracket typeTruvativ Howitzer XR
Crankset parts and sizes 24/36 Teeth
TruVativ Hussefelt 2.2 RG DH and E-13 DRS
Gear shift leversSRAM X.7 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Marin Quake 7.8 Fork System Data

Derailleur (Front)SRAM X.7
Derailleur (Rear)SRAM X.9
Fork materialSingle
Fork type 180 (millimeters) Travel
Marzocchi 66 RCV

Other Specs of Marin Quake 7.8

Component group setsSRAM X.7/mix
Pedals detailsBMX Platform
Rear shock absorber 170 (millimeters) Travel
Marzocchi Rocco TST
Saddle seatWTB Pure V Race
Seat post extension 31.6 (millimeters) Diameter
Syncros Derived


Useful links and guides ....