Merlin CRITICAL PATH 1998 VS Mongoose TEOCALI SUPER 2007 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
![Mongoose Teocali Super 2007 comparison online with competitors](https://yobicycle.com/images/models/Mongoose-Teocali-Super-2007-specs.jpg)
Mongoose Teocali Super
General InfosModel | Teocali Super |
Manufacturer | Mongoose |
Year of production | 2007 |
Current price | Check price Here ==> |
Color choice |
-Lime Gold |
Sizes |
- Small - medium - large |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.10 (inches) Kenda Nevegal DTC Folding Front: 26 X 2.35 (inches) Kenda Nevegal DTC Folding |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Juicy 7 Hydraulic Levers Avid Juicy 7 HD With 7 (inches) Rotor Front and Avid Juicy 7 HD With 6 (inches) Rotor Rear Brakes |
Hubs for disc brakes | Rear: WTB Laser Disc Lite Front: WTB Laser Disc Super Duty 20 (millimeters) |
Rims manufacturer | 28-hole WTB Laser Disc Trail |
Spoke nipples type | CP Brass |
Spoke wheel | WTB Stainless Steel |
Frame and Body Specs
Frame materials | FreeDrive All Mountain |
Frame type | TIG-welded |
Handlebar construction | Easton EA70 Lo Rise |
Handlebar extender | Optional |
Handlebar stem details | Easton Vice AM |
Headset size | WTB Team |
Gearing Specifications
Bicycle chain | KMC Z9900 |
Bottom bracket shell width | Not Available |
Bottom bracket type | FSA Mega EXO |
Crankset parts and sizes | 22/32/44 Teeth FSA Afterburner |
Gear shift levers | SRAM X.9 Impulse Trigger |
Rear gear set | 11 - 34 Teeth 9-speed |
Mongoose Teocali Super Fork System Data
Derailleur (Front) | Shimano Deore XT |
Derailleur (Rear) | SRAM X.9 Med. Cage |
Fork material | Single Crown Aluminum and magnesium |
Fork type | 140 (millimeters) Travel Rock Shox Pike 454 Dual Air Thru Axle |
Other Specs of Mongoose Teocali Super
Component group sets | Mountain Mix |
Pedals details | Crank Brothers Smarty |
Rear shock absorber | 124 - 145 (millimeters) Adjustable Travel Rock Shox MC 3.3 Air |
Saddle seat | Kore Enduro I-Beam |
Seat post extension | 31.6 (millimeters) Diameter Kore I-Beam Race |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Mongoose Teocali Super manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Mongoose Teocali Super Mountain bike here