Merlin CRITICAL PATH 1998 VS Mountain Cycle SAN ANDREAS DHS 1996 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Mountain Cycle San Andreas DHS
General InfosModel | San Andreas DHS |
Manufacturer | Mountain Cycle |
Year of production | 1996 |
Current price | Check price Here ==> |
Color choice |
-Black with polished swingarm |
Sizes |
- Large - medium - small - womens large - womens medium - womens small - womens xsmall - xsmall |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.10 (inches) Onza Honch Bolas Grande Front: 26 X 2.10 (inches) Onza Aggro Bolas Grande |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Pro Stop Full Hydraulic Levers Pro Stop Full Hydraulic Brakes |
Hubs for disc brakes | Not Available |
Rims manufacturer | 32-hole HED |
Spoke nipples type | Splined Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Aero DT Stainless Steel |
Frame and Body Specs
Frame materials | Heat-treated 6061 T6 Aluminum |
Frame type | TIG-welded Steel and welded Aluminum |
Handlebar construction | Azonic and O'Neal World Force |
Handlebar extender | Optional |
Handlebar stem details | Qranc |
Headset size | Comes With Fork 1 1/8 (inches) Not Applicable |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Taya Pro Extreme |
Bottom bracket shell width | 73 (millimeters) English |
Bottom bracket type | 122.5 (millimeters) Spindle Adventure Components |
Crankset parts and sizes | Adventure Components Race |
Gear shift levers | Grip Shift SRT-800 X-Ray |
Rear gear set | 12 - 32 Teeth 8-speed |
Mountain Cycle San Andreas DHS Fork System Data
Derailleur (Front) | Bottom-pull Shimano Deore XT |
Derailleur (Rear) | Shimano XTR |
Fork material | Triple-clamp Crown Aluminum |
Fork type | Mr. Dirt -PBF |
Other Specs of Mountain Cycle San Andreas DHS
Component group sets | Not Available |
Pedals details | Optional |
Rear shock absorber | 6.0 (inches) + Travel Risse Terminator |
Saddle seat | Titanium Rails SDG 2000 Kevlar |
Seat post extension | 31.6 (millimeters) Diameter Adventure Components |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Mountain Cycle San Andreas DHS manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Mountain Cycle San Andreas DHS Mountain bike here