Merlin CRITICAL PATH 1998 VS Mountain Tek 6006 FS 1996 specs comparison
🔥 Compare prices & customer reviews on Amazon
✔ Free shipping on many items • ✔ Easy returns • ✔ Trusted store
➜ Merlin Critical Path price
➜ Mountain Tek 6006 FS price
Merlin Critical Path
General Infos| Model | Critical Path |
| Manufacturer | Merlin |
| Year of production | 1998 |
| Current price | 🛒 View Price → |
| Color choice | -Brushed |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
| Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
| Bike rear tire | Not Available |
| Bike wheel size | 26 (inches) Wheels |
| Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
| Hubs for disc brakes | Shimano XTR |
| Rims manufacturer | 32-holeMavic 217 SUP |
| Spoke nipples type | Alloy Nipples |
| Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
| Frame materials | 3Al and 2.5V Titanium |
| Frame type | TIG-welded |
| Handlebar construction | Syncros Hardcore |
| Handlebar extender | Optional |
| Handlebar stem details | Syncros Hardcore |
| Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
| Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
| Bottom bracket shell width | 68 (millimeters) English |
| Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
| Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
| Gear shift levers | Shimano XTR RapidFire SL |
| Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
| Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
| Derailleur (Rear) | Shimano XTR SGS |
| Fork material | Triple-clamp CrownAluminum and magnesium |
| Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
| Component group sets | Shimano XTR |
| Pedals details | Optional |
| Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
| Saddle seat | Bontrager With Titanium Rails |
| Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
Mountain Tek 6006 FS
General Infos| Model | 6006 FS |
| Manufacturer | Mountain Tek |
| Year of production | 1996 |
| Current price | 🛒 View Price → |
| Color choice | -Silver |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches)- 21 (inches) |
Wheels And Breaking System
| Bike front tire | 26 X 2.10 (inches) Kenda K-850 |
| Bike rear tire | Not Available |
| Bike wheel size | 26 (inches) Wheels |
| Brakeset type | Tektro 371AP LeversTektro 863A Brakes |
| Hubs for disc brakes | Not Available |
| Rims manufacturer | 36-holeAlex A-564A |
| Spoke nipples type | Brass Nipples |
| Spoke wheel | Not Available |
Frame and Body Specs
| Frame materials | Double-butted OversizeChromoly |
| Frame type | TIG-welded Steel |
| Handlebar construction | Lee Chi Steel |
| Handlebar extender | Tsan Ming TMA 300 |
| Handlebar stem details | Sameness MS-151S |
| Headset size | 1 1/8 (inches) YST 662 |
Gearing Specifications
| Bicycle chain | 1/2 X 3/32 (inches)KMC UG-50 |
| Bottom bracket shell width | 68 (millimeters) English |
| Bottom bracket type | YST |
| Crankset parts and sizes | 24/32/42 TeethSR CW-CH15 |
| Gear shift levers | Grip Shift MRX-100 |
| Rear gear set | 11 - 28 Teeth7-speed |
Mountain Tek 6006 FS Fork System Data
| Derailleur (Front) | Suntour FD-XR15 |
| Derailleur (Rear) | Shimano AceraX |
| Fork material | Triple-clamp CrownChromoly |
| Fork type | RST 156 |
Other Specs of Mountain Tek 6006 FS
| Component group sets | Shimano AceraX |
| Pedals details | Wellgo LU-934OP |
| Rear shock absorber | Not Available |
| Saddle seat | Velo VL-161-2EM |
| Seat post extension | Kalloy SP-09 |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Mountain Tek 6006 FS manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Mountain Tek 6006 FS Mountain bike here