Merlin CRITICAL PATH 1998 VS Norco A-LINE 2007 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Norco A-Line
General InfosModel | A-Line |
Manufacturer | Norco |
Year of production | 2007 |
Current price | Check price Here ==> |
Color choice |
-Black |
Sizes |
- Small/medium - medium/large |
Wheels And Breaking System
Bike front tire | 26 X 2.50 (inches) Kenda Nevegal DH Stick-E |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Juicy 5 Levers Avid Juicy 5 With 8 (inches) Rotor Brakes |
Hubs for disc brakes | Rear: Norco 150 (millimeters) X 12 (millimeters) Front: Norco 20 (millimeters) |
Rims manufacturer | 32-hole Sun MTX S-Type |
Spoke nipples type | Not Available |
Spoke wheel | 14ga. DT Swiss Stainless Steel |
Frame and Body Specs
Frame materials | Hydraformed Aluminum |
Frame type | TIG-welded |
Handlebar construction | Syncros Butted |
Handlebar extender | Optional |
Handlebar stem details | Marzocchi 888 |
Headset size | FSA TH-872 |
Gearing Specifications
Bicycle chain | SRAM PC-950 |
Bottom bracket shell width | Not Available |
Bottom bracket type | TruVativ Howitzer |
Crankset parts and sizes | 38 Teeth TruVativ Hussefelt |
Gear shift levers | SRAM X-7 Trigger |
Rear gear set | 11 - 32 Teeth 9-speed |
Norco A-Line Fork System Data
Derailleur (Front) | Not Available |
Derailleur (Rear) | SRAM X-7 Medium Cage |
Fork material | Dual Crown Aluminum and magnesium |
Fork type | 200 (millimeters) Travel Marzocchi 888 RCV |
Other Specs of Norco A-Line
Component group sets | Downhill Mix |
Pedals details | Wellgo LU-A18 |
Rear shock absorber | 196 - 229 (millimeters) Adjustable Travel Fox DHX-3 |
Saddle seat | WTB Pure V |
Seat post extension | 27.2 (millimeters) Diameter Truvativ XR |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Norco A-Line manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Norco A-Line Mountain bike here