Merlin CRITICAL PATH 1998 VS Norco FLID LT 1 2008 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice | -Brushed |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-holeMavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp CrownAluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |

Norco Flid Lt 1
General InfosModel | Flid Lt 1 |
Manufacturer | Norco |
Year of production | 2008 |
Current price | Check price Here ==> |
Color choice | -Blue and Grey |
Sizes | - Xsmall - small - medium - large - xlarge |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) Kenda Nevegal |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Juicy Carbon LeversAvid Juicy Carbon With 7 (inches) Rotor Brakes |
Hubs for disc brakes | Rear: Dt Swiss 340 DiscFront: DT Swiss 340 Disc Thru Axle |
Rims manufacturer | Mavic 719 |
Spoke nipples type | Not Available |
Spoke wheel | DT Swiss Stainless Steel |
Frame and Body Specs
Frame materials | Aluminum |
Frame type | TIG-welded |
Handlebar construction | Syncros Race Gain |
Handlebar extender | Not Available |
Handlebar stem details | 31.8 (millimeters) ClampSyncros FLS |
Headset size | 1 1/8 (inches) Threadless Syncros AM Hardcore |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)SRAM PC-971 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano XTR |
Crankset parts and sizes | 24/34/44 TeethShimano XTR |
Gear shift levers | SRAM X.0 Trigger |
Rear gear set | 11 - 34 Teeth9-speed |
Norco Flid Lt 1 Fork System Data
Derailleur (Front) | 31.8 (millimeters) ClampShimano XT |
Derailleur (Rear) | SRAM X.0 |
Fork material | Single |
Fork type | 160 (millimeters) TravelRockShox Lyric |
Other Specs of Norco Flid Lt 1
Component group sets | Mountain Mix |
Pedals details | Crank Brothers Candy SL |
Rear shock absorber | 137-158 (millimeters)Fox DHX Air 5.0 |
Saddle seat | WTB SLT Rocket V |
Seat post extension | 27.2 (millimeters) DiameterSyncros |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Norco Flid Lt 1 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Norco Flid Lt 1 Mountain bike here