Merlin CRITICAL PATH 1998 VS Norco XCS-2 1999 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Norco XCS-2 1999 comparison online with competitors

Norco XCS-2

General Infos
Model XCS-2
Manufacturer Norco
Year of production 1999
Current price Check price Here ==>   
Color choice -Red and Silver
Sizes - Medium/large
- small/medium

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Panaracer Fire XC
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid SD-1.9 L Levers
Avid 1D-10 Brakes
Hubs for disc brakesShimano STX-RC
Rims manufacturer 32-hole
Sun Rims ZJ-18
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Straight Gauge
DT Stainless Steel

Frame and Body Specs

Frame materials7005 Aluminum With Replaceable Derailleur Hanger
Frame typeTIG-welded
Handlebar constructionAxiom Riser
Handlebar extenderOptional
Handlebar stem detailsJD Comp JD-349
Headset size1 1/8 (inches) Threadless Dia-Tech SBN

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG51
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 110 (millimeters) Spindle
Shimano Cartridge
Crankset parts and sizes 22/32/42 Teeth
Shimano STX-RC
Gear shift leversGrip Shift Quarz
Rear gear set 11 - 28 Teeth
8-speed

Norco XCS-2 Fork System Data

Derailleur (Front)Shimano Deore LX Top-swing
Derailleur (Rear)Shimano Deore XT SGS
Fork material Triple-clamp Crown
Aluminum
Fork type 2.75 (inches) Travel
Marzocchi Bomber Z-5

Other Specs of Norco XCS-2

Component group setsMountain Mix
Pedals detailsVictor VP-135
Rear shock absorber 4.0 (inches) Travel
Fox Vanilla
Saddle seatSelle Italia XO
Seat post extension 30.0 (millimeters) Diameter
JD Components 495


Useful links and guides ....