Merlin CRITICAL PATH 1998 VS Pivot MACH 4 XT/SLX 2010 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Pivot Mach 4 XT/SLX
General InfosModel | Mach 4 XT/SLX |
Manufacturer | Pivot |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice |
- Anodized Jet Black - Pink and White (women's) - Sky Blue and White (women's) - White and Black -Anodized Colbalt Blue |
Sizes |
- Xx-small - x-small - small - medium - large - x-large |
Wheels And Breaking System
Bike front tire | 26 (inches) Kenda Nevagal |
Bike rear tire | Not Available |
Bike wheel size | Not Available |
Brakeset type | Hayes Stroker Trail Levers Hayes Stroker Trail Brakes |
Hubs for disc brakes | Not Available |
Rims manufacturer | Not Available |
Spoke nipples type | Not Available |
Spoke wheel | DT Stainless Steel |
Frame and Body Specs
Frame materials | 6000 Triple Butted Hydroformed Aluminum |
Frame type | TIG-welded |
Handlebar construction | 670 (millimeters) X 20 (millimeters) Ritchey Mtn Riser |
Handlebar extender | Optional |
Handlebar stem details | Ritchey MTN Comp |
Headset size | 1 1/8 (inches) Semi-ntegrated Ritchey Comp |
Gearing Specifications
Bicycle chain | Not Available |
Bottom bracket shell width | 92 (millimeters) |
Bottom bracket type | Shimano XTR Internal |
Crankset parts and sizes | Shimano SLX |
Gear shift levers | Shimano SLX |
Rear gear set | 11 - 34 Teeth 9-speed |
Pivot Mach 4 XT/SLX Fork System Data
Derailleur (Front) | E-type Shimano SLX |
Derailleur (Rear) | Shimano XT SGS |
Fork material | Single Crown Magnesium and aluminum |
Fork type | 100 (millimeters) Travel Fox 32 FR 15 (millimeters) QR |
Other Specs of Pivot Mach 4 XT/SLX
Component group sets | Mountain Mix |
Pedals details | Optional |
Rear shock absorber | 4 (inches) Travel Fox RP23 |
Saddle seat | WTB Silverado RC |
Seat post extension | 30.9 (millimeters) Diameter Ritchey Comp |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Pivot Mach 4 XT/SLX manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Pivot Mach 4 XT/SLX Mountain bike here