Merlin CRITICAL PATH 1998 VS Pivot MACH 5/ XTR ULTRALITE 2008 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Pivot Mach 5/ XTR Ultralite 2008 comparison online with competitors

Pivot Mach 5/ XTR Ultralite

General Infos
Model Mach 5/ XTR Ultralite
Manufacturer Pivot
Year of production 2008
Current price Check price Here ==>   
Color choice - Anodized Cobalt Blue
- Painted
-Anodized Grpahite Gray
Sizes - Extra small
- Small
- Medium
- Large

Wheels And Breaking System

Bike front tire DTC
Rear: 26 X 2.35 (inches) Kenda Small Block Eight
Front: 26 X 2.35 (inches) Kenda Nevegal DTC
Bike rear tireNot Available
Bike wheel sizeNot Available
Brakeset type Magura Marta SL Levers
Magura Marta SL Brakes
Hubs for disc brakesNot Available
Rims manufacturerDT Swiss
Spoke nipples typeNot Available
Spoke wheelNot Available

Frame and Body Specs

Frame materials7075-T6 Aluminum
Frame typeTIG-welded
Handlebar constructionRitchey WCS Carbon
Handlebar extenderOptional
Handlebar stem detailsRitchey WCS 4-Axis
Headset size1 1/8 (inches) Ritchey Wcs

Gearing Specifications

Bicycle chainShimano XTR
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizesShimano XTR HollowTech II
Gear shift leversShimano XTR
Rear gear set 11 - 34 Teeth
9-speed

Pivot Mach 5/ XTR Ultralite Fork System Data

Derailleur (Front)Shimano XTR
Derailleur (Rear)Shimano XTR
Fork material Single Crown
Aluminum and magnesium
Fork type 120/140 (millimeters) Travel
Fox 32 Talas RLC

Other Specs of Pivot Mach 5/ XTR Ultralite

Component group setsShimano XTR
Pedals detailsNot Available
Rear shock absorber 5.4 (inches) Travel
Fox Float
Saddle seatWTB Rocket V SLT Ti Rails
Seat post extensionRitchey WCS Carbon


Useful links and guides ....